ELECTRICAL BIM

Panel Schedule
Revision Checker

Compare two Revit panel schedule revisions. See which circuits moved, what changed, and what was added or removed.

Compare revisions

Choose two Excel workbooks for the same panel. Files are processed in your browser.

Import a formatted PanelLink schedule

Use the row numbers and column letters from the exported Excel sheet. A split schedule can have two circuit groups. Separate the groups with a semicolon. Use the same mapping for both revisions or enter a different one for the new revision.

For each group, enter the circuit, description, breaker and load columns in that order. Join dedicated phase load columns with +. Append a stable circuit ID column if available.

See a worked example and unit rules.

Prepare your workbooks

Use one panel per workbook and the same load units in both revisions. The guide includes sample workbooks you can upload, required headers and circuit matching rules.

Open workbook guide

Paid pilot · $29 one-time

Register interest if the checker would save your team review time at this price. Joining is free.